Hurpal LLC

HurPal Raseel

Production planning and shop floor control, built on Business Central

Plan every order.
Run every shift.
From one screen.

Raseel turns your Microsoft Dynamics 365 Business Central manufacturing data into a planner-friendly workspace. Schedule production orders, balance machines and work centers, catch material shortages early, and publish changes back to BC when you’re ready.

Works with your existing Business Central setup.No data migration, no second system of record.

Production
Planning Floor Schedule Load Routings
Synced 1:34 PM
Search orders, customers…
Backlog 0 DayWeek ‹Now› Thu 7 AM – 7 PM
3 changes in draft Discard Publish to Business Central
Line
7 AM8 AM9 AM10 AM11 AM12 PM1 PM2 PM3 PM4 PM5 PM6 PM
Machine departmentTwo shifts, Monday–Friday
CNC Mill 2Machine center
101005 · Op 10
101010 · Op 10
Drilling machineMachine center
101011 · Paused
101014 · Op 10
Machine deburrMachine center
101005 · Op 20
Assembly departmentOne shift, Monday–Friday
Assembly line 1Work center
101005 · Op 30
Assembly line 2Work center
101010 · Op 20Short
Packing departmentOne shift, Monday–Friday
Packing table 1Work center
101005 · Op 40
Packing machineMachine center
101012 · Draft
Planned Started Finished Paused Draft Not working
1:30 PM
The problem

Your ERP knows everything. Your planners still use spreadsheets.

Business Central holds your production orders, routings, work centers and inventory. But production planning moves fast, and ERP screens weren’t built for it. Planners jump between pages, export to Excel, and rebuild the schedule by hand every morning.

The result is familiar:

  1. 01Machines sit idle while upstream work waits on a resource that was double-booked.
  2. 02Shortages surface too late, after an order is already released to the floor.
  3. 03Every what-if is risky, because changing the schedule means changing live ERP data.
  4. 04The shop floor and the office see different pictures of what’s running right now.
What is Raseel

A planning workspace made for the shop floor.

Raseel is a production floor management and scheduling app for manufacturers running Microsoft Dynamics 365 Business Central. It reads your production orders, routings, work centers, machine centers and inventory directly from BC, and presents them in views designed for the way planners actually think: by line, by shift, by machine.

Business Central stays your single source of truth. Raseel is the fast, visual layer on top of it, where planners see the whole day at a glance, test changes safely, and push decisions back to BC with one click.

HurPal Raseel
The planning layer
Planning board Floor board Gantt schedule Capacity load Routings setup
Reads live data ↑
Publishes decisions ↓
Microsoft Dynamics 365 Business Central
Your system of record
Production orders Routings Work centers Machine centers Inventory
Five views, one plan

Everything a planner needs, from next week’s orders to what’s on the machine right now.

01 · Planning

Planning board

See every open production order in one place, grouped by status and due date. Drag orders into sequence, spot what’s late, and decide what runs next without opening a single BC page.

Released sales orders
2 lines to produce
S-ORD101031Ships Oct 2
Reservoir Assembly
Trey Research · 10 pcs to plan
Firm planRelease
S-ORD101036Ships Oct 6
Airpot – Serial
Adatum Corp. · 40 pcs to plan
Firm planned
Drop a sales order to firm plan it
S-ORD101034Ships Oct 5
AutoDrip
Fabrikam · 24 pcs
101010 P3Due Oct 1
AutoDrip ×3
For S-ORD101029 · material short
DetailsReleaseDelete
Released production orders
9 on the floor
101005Due Oct 2
Airpot – Parallel ×20
Op 30 · Assembly · Running
101004Due Oct 5
Reservoir Assembly ×10
Op 20 · Electrical wiring · Ready
02 · Floor

Floor board

A live view of the shop floor. See which operations are running, paused or waiting at each work center, so supervisors and planners share the same real-time picture.

Machine dept.2 orders
CNC Mill 2
101010 AutoDrip ×3 Running · on plan
PauseReport output
Drilling machine
101011 Airpot – Serial ×12 Paused · waiting on material
Assembly dept.2 orders
Assembly line 1
101005 Airpot – Parallel ×20 Running · 12 of 20 done
101004 Reservoir Assembly ×10 Next · starts 2:00 PM
Assembly line 2
Idle · drop an order here
03 · Schedule

Gantt schedule

A visual timeline of every operation across your machines, cells, assembly lines and packing stations. Drag a bar to move a job, and Raseel reschedules the downstream steps for you. Changes stay in draft until you publish them.

Line
MonTueWedThuFri
CNC Mill 2
Drilling
101012
Assembly 1
Packing 1
Draft · 2 downstream steps rescheduled Publish
04 · Load

Capacity load

See how loaded each work center and machine center is, hour by hour and day by day. Find the bottleneck before it becomes a backlog, and rebalance work across equipment.

LineMon, Oct 5Tue, Oct 6Wed, Oct 7Thu, Oct 8Fri, Oct 9Sat, Oct 10
CNC Mill 2
92%
108%
78%
64%
40%
closed
Drilling machine
55%
62%
70%
48%
30%
closed
Assembly line 1
88%
96%
112%
84%
60%
closed
Packing table 1
40%
52%
68%
74%
90%
closed
05 · Routings

Routings setup

View and edit routing steps, run times, setup times and send-ahead quantities directly in Raseel. Edits save to Business Central the moment you confirm them, so your master data stays accurate.

SP-BOM2000 · Reservoir Assembly Certified Saved to Business Central
OpWork ctrDescriptionSetupRunSend-aheadConcurrent
10100Machining 15 5 20 1
20110Electrical wiring 15 8 25 1
30120Testing 10 6 0 1
40900Cost allocation Not scheduled 0 0 – –
Built for real production

Generic schedulers treat operations as boxes. Raseel models how your line actually flows.

Send-ahead overlap scheduling

On a real line, the next operation doesn’t wait for the whole lot to finish. Raseel models send-ahead quantities explicitly, so assembly can start as soon as the first parts leave machining. Your schedule reflects how work really moves, and lead times shrink on screen the way they do on the floor.

Without send-ahead
Op 10 · Machining
Op 20 · Assembly
Lead time
With send-ahead · 20 pcs
Op 10 · Machining
Op 20 · Assembly
starts after the first 20 pcs
Lead time

Material shortage alerts

Raseel walks your orders in schedule order and allocates on-hand inventory as it goes. If raw materials, components or packaging will run short for a later order, you see it on that order before it reaches the floor. Move an order in the draft and the shortage picture updates instantly.

Steel bracket SB-200On hand 240
1101005 · Thu 7:30 AM−120120
2101010 · Thu 11:30 AM−9030
3101012 · Fri 8:00 AM−80Short 50

Draft, preview, publish

Planners need room to experiment. Every drag-and-drop change in the Gantt goes into a draft queue first. Try a new sequence, compare it, and publish to Business Central only when it works. Nothing touches live data until you say so.

Draft · 3 changesNot yet in BC
101012Moved to Packing machine, Thu 1:30 PM
101010Sequenced ahead of 101011 on CNC Mill 2
1010052 downstream operations rescheduled
DiscardPublish to Business Central

Work centers and machine centers, unified

Some routing steps point to a whole work center, like Assembly. Others point to a specific machine, like CNC Mill 2. Raseel treats both as schedulable resources, so every routing in BC plans correctly, however it was set up.

Op 10CNC Mill 2Machine center
Op 20AssemblyWork center

Clean schedules, no noise

Zero-time cost lines, such as routing steps used only for costing, are filtered out automatically. Planners see only the operations that actually take time on the floor.

Op 30Testing16 min
Op 40Cost allocationFiltered out
Business Central integration

Native to Business Central. Not bolted on.

Raseel connects to Microsoft Dynamics 365 Business Central through a dedicated BC extension and a secure API layer. There’s no nightly sync and no duplicate database: Raseel reads live BC data and writes your published decisions straight back.

01

One fast snapshot.

Raseel gathers orders, routings, resources and inventory from BC in a single optimized request, so the planning board loads in seconds.

02

Secure by design.

Access runs through Microsoft Entra ID, using the same identity platform your organization already trusts.

03

Shop floor actions inside BC.

Start, pause, resume and report output directly from the Prod. Order Routing page, with pause reasons captured for later analysis. No scanner hardware required to get started.

04

Your data stays yours.

Production orders, routings and inventory remain in Business Central, with its permissions, audit trail and reporting intact.

Who it’s for

One plan, shared by everyone who makes it happen.

Production planners

A visual schedule they can rearrange by drag and drop, test safely in draft, and publish to BC in one step.

Shop floor supervisors

A live view of what’s running, paused or next at every work center, and simple start, pause and report actions.

Operations managers

Capacity load across machines, work centers and lines, so bottlenecks are visible before they cost output.

Purchasing and inventory

Early warning of material shortages, tied to the exact order and date they’ll hit.

IT and ERP teams

A clean BC extension and secure Entra ID integration, with Business Central remaining the system of record.

How it works

From ERP data to a running schedule in three steps.

  1. 1

    Connect.

    Install the Raseel extension in Business Central and connect through Microsoft Entra ID. Raseel reads your existing orders, routings, work centers and inventory. Nothing to re-enter.

  2. 2

    Plan.

    Arrange orders on the Planning board and Gantt schedule. Raseel handles send-ahead overlap, flags material shortages and shows capacity load as you work, all in a safe draft.

  3. 3

    Publish and run.

    Publish the schedule to Business Central in one click. The shop floor follows it, reports progress, and the Floor board updates so everyone stays in sync.

FAQ

Frequently asked questions

Does Raseel replace Business Central?+

No. Business Central remains your system of record. Raseel is a planning and shop floor layer that reads from BC and writes published changes back to it.

What kinds of manufacturers is Raseel for?+

Any discrete or batch manufacturer that runs production orders and routings in Business Central, from machining and fabrication to assembly, food and packaging.

Do we need to change our routings or master data?+

No. Raseel works with routings that use work centers, machine centers, or a mix of both. Costing-only steps are filtered out automatically.

What happens when I move a job on the Gantt?+

The change goes into a draft. Raseel recalculates downstream operations and material availability instantly. Nothing is written to BC until you publish.

How does Raseel handle overlapping operations?+

Raseel uses the send-ahead quantity on each routing step, so a downstream operation can start as soon as enough units arrive from the step before it.

Do we need barcode scanners on the shop floor?+

Not to get started. Operators can start, pause, resume and report output directly from the Prod. Order Routing page in Business Central.

How is access secured?+

Raseel authenticates to Business Central through Microsoft Entra ID, so access is governed by your organization’s existing identity and permission policies.

Which Business Central versions are supported?+

Raseel supports Microsoft Dynamics 365 Business Central online (SaaS).

Give your planners a tool that thinks like your plant.

See Raseel running on your own Business Central data. We’ll walk through your routings, your work centers and next week’s orders, and show you what your schedule looks like when it finally fits on one screen.

Book a demo